Transmission Line Rebuild
This is an electric maintenance project to prevent damaged connections (due to mismatched material) from failing and causing transmission power outages.
This is an electric maintenance project to prevent damaged connections (due to mismatched material) from failing and causing transmission power outages.
A 5-year potable water well rehabilitation plan for 19 wells. This maintenance and rehabilitation plan will optimize the production of our wells and ensure the safeguarding of our precious water resource.
This is for the reconstruction of the existing lift station located at the NW corner of Duss Street and Washington Street, which will include new discharge piping between Mary Avenue and Washington Street.
Relocation of the water main, sewer main, and electric conduit off the existing 5th Street Bridge. This work is being done in advance of the City of New Smyrna Beach 5th Street Bridge replacement project.
Rehabilitation of Glencoe Well Sites No. 2 and No. 3
Relocation of water main, sewer main, and electric conduit off the existing Barracuda Bridge. In addition, the NSBU has incorporated planned equipment upgrades. This work is being done in coordination with the FDOT Bridge replacement project.
Chemical conversion from gas to liquid treatment.